Description
Added on the 01/12/2020 06:48:21 - Copyright : Auto Moto EN
Kandahar / Kabul, Aug 23 (EFE / EPA) .- After a week in power, the Taliban are beginning to get impatient with the United States, whose final departure from the country seems to be extended beyond the expected August 31 due to chaos at Kabul airport during evacuations.Since the Taliban took power, Kabul's Hamid Karzai International Airport military zone is in practice the only place in the country that remains under the control of international forces, with the United States commanding security to evacuate thousands of foreign nationals and Afghan allies.However, these exits have been slowed down by the chaos at the airport, where for a week thousands of people have gathered at its entrances to try to access one of the evacuation flights, causing the death of at least seven civilians.(Camera: AKHTER GULFAM) SHOT LIST: A ROAD TRIP FROM KANDAHAR TO KABUL (AFGHANISTAN).
Une mine de diamants s'effondre dans le Grand Nord canadien et piège près de trente mineurs. Pour mener une mission de sauvetage périlleuse, Jim Goldenrod engage Mike McCann, un conducteur de camion expérimenté.
Une mine de diamants s'effondre dans le Grand Nord canadien et piège près de trente mineurs. Pour mener une mission de sauvetage périlleuse, Jim Goldenrod engage Mike McCann, un conducteur de camion expérimenté.
Une mine de diamants s'effondre dans le Grand Nord canadien et piège près de trente mineurs. Pour mener une mission de sauvetage périlleuse, Jim Goldenrod engage Mike McCann, un conducteur de camion expérimenté.
Bangkok, Mar 26 (EFE/EPA).- Thailand's new Red Line suburban railway Friday underwent a test run for service before it is scheduled to open in late 2021 with the Bang Sue Grand Station as a hub. (Camera: NARONG SANGNAK).SHOT LIST: THE TEST RUN OF THAILAND'S NEW RED LINE SUBURBAN RAILWAY SYSTEM IN BANGKOK, THAILAND.
Bangkok, Jan 27 (EFE/EPA).- Thai transportation authorities began on Wednesday the test runs of Greater Bangkok's new Red Line electric train service, which will open in November. The Red Line, to be operated by the State Railway of Thaliand, will run from the new Bang Sue Grand Station to Rangsit in Pathum Thani.The Bang Sue Grand Station will serve as a hub for a high-speed train connecting airports of Don Mueang airport, Suvarnabhumi airport and U-Tapao airport. (Camera: NARONG SANGNAK).SHOT LIST: THE RED LINE SUBURBAN RAILWAY TEST RUN AT THE BANG SUE GRAND STATION IN BANGKOK, THAILAND.